Deliverables

Year 1

No. Deliverable WP Task Planned Delivery Delivery Status Reports
D1.1 RI Co-Innovation platform MoU  1 1.4 M6 08/12/2021 Achieved Report
D1.2 Internal communication Plan 1 1.3 M6 31/10/2021 Achieved Report
D2.1 Communication strategy 2 2.2 M6 29/10/2021 Achieved Report
D8.1 HTS European Strategy Group 8 8.1 M6 24/03/2022 Achieved Report
D14.1 POPD - Requirement Nr1 14 14.1 M6 29/10/2021 Achieved Restricted
D14.2 EPQ - Requirement Nr2 14 14.2 M7 30/11/2021 Achieved Restricted
D8.2 Conceptual Design of combined CCT in LTS 8 8.2 M10 21/02/2021 Achieved Report
D10.3 Additive-manufactured SRF cavities 10 10.3 M12 15/12/2022
Achieved
Report

Year 2

No. Deliverable WP Task Planned Delivery Delivery Status Reports
D2.2 Challenge-Based Innovation scheme 2 2.3 M24 30/04/2023 Achieved Report
D2.3 Industrial training scheme 2 2.4 M24 (Delayed to M36)      
D4.1 Evaluation criteria for IIF projects, and Evaluation Body 4 4.1 M20 01/02/2023 Achieved Report
D4.2 IIF Projects awarding 4 4.2 M24 03/04/2023 Achieved Report
D4.4 Production of large-size CCM plates 4 4.4 M24 30/04/2023
Achieved
Achieved
Report
D6.3 Electron acceleration experiments with new targets 6 6.3 M24 30/04/2023 Achieved Report
D7.5 Construction of the XLS accelerating structure pre-prototype 7 7.5 M24 (Delayed to M32)      
D8.3 First Engineering design of HTS demonstrator 8 8.3 M18 30/04/2023 Achieved Report
D10.2 Survey of AM applications and strategies for repairing component by AM 10 10.2 M24 30/04/2023 Achieved Report
D10.6 Electro-optic performance report 10 10.6 M24 30/04/2023 Achieved Report
D12.2 Basic engineering of e-beam sludge processing line 12 12.2 M24 30/04/2023 Achieved Report
D12.3 Prototype of Internal RF Ion Source for Cyclotrons 12 12.3 M24 (Delayed to M31) 01/12/2023 Achieved Report
D13.1 Strategy for the development of the AMICI 13 13.1 M24 (Delayed to M30) 30/10/2023 Achieved Report
D13.2 Report on the development and promotion of services to industry 13 13.2 M24 (Delayed to M30) 30/10/2023 Achieved Report
D13.3 GaN RF amplifier module at kW level 13 13.3 M24 (Delayed to M33) 14/12/2023 Achieved Report

Year 3

No. Deliverable WP Task Planned Delivery Delivery Status Reports
D3.1 Industry Workshop Report 3 3.1 M26 30/06/2023 Achieved Report
D3.2 Business development case report 3 3.2 M36 21/05/204 Achieved Report
D3.3 Report on extended industrial contributions in R&D activities 3 3.3 M36 16/02/2024 Achieved Report
D4.3 Beam-windows prototypes 4 4.3 M32 03/06/2024 Achieved Report
D6.4 Improvement of the laser intensity stability on target 6 6.4 M36 07/05/2024 Achieved Report
D7.6 Construction of the XLS accelerating structure full prototype 7 7.5 M36      
D8.6 Fast-cycling Nuclotron HTS cable design 8 8.6 M32 16/02/2024 Achieved Report
D9.1 Thin-Film SRF roadmap report 9 9.1 M35 07/01/2025 Achieved Report
D10.1 Potential AM applications in accelerators 10 10.1 M30 25/10/2023 Achieved Report
D10.4 First PSD data from NEG coating 10 10.4 M36 29/11/2024 Achieved Report
D10.5 Technical Report on machine learning at ESS 10 10.5 M34 21/02/2025 Achieved Report
D11.2 Klystron prototype completed and validated 11 11.2 M36 10/04/2025 Achieved Report
D11.3 Prototype adjustable PM quadrupole and combined function magnets 11 11.3 M28      
D12.1 Strategy for Implementing Novel Societal Applications of Accelerators 12 12.1 M28 14/09/2023 Achieved Report

Year 4

No. Deliverable WP Task Planned Delivery Delivery Status Reports
D5.1 International collaboration plans towards a multi-TeV muon collider 5 5.1 M46      
D5.2 Roadmap for future accelerators 5 5.2 M42 03/10/2024 Achieved Report
D5.3 Ripple mitigation for slow extraction beam quality improvement 5 5.3 M46 14/03/2025 Achieved Report
D6.1 EAAC workshops and strategies 6 6.1 M42 30/10/2024 Achieved Report
D6.2 LASPLA Strategy 6 6.2 M46 10/03/2025 Achieved Report
D7.1 Final report on the development of high brightness electron beams for light sources 7 7.1 M48      
D7.2 Report on enabling technology for ultralow emittance ring 7 7.2 M45 31/01/2025 Achieved Report
D7.3 Longitudinally variable bend prototype fabrication 7 7.3 M40      
D7.4 Mechanical realization and low power RF test of the two RF guns 7 7.4 M38      
D8.4 Construction of curved CCT demonstrator 8 8.4 M38      
D8.5 Construction of HTS CCT demonstrator 8 8.5 M42      
D9.2 RF test on coated resonant cavity 9 9.2 M46      
D9.4 Deposition of SC multilayers on cavities 9 9.4 M46 07/02/2025 Achieved Report
D9.5 1.3 GHz Nb-coated cavity irradiated by laser in argon atmosphere and RF tested 9 9.5 M45      
D9.6 Test of thin-film samples 9 9.6 M46 31/01/2025 Achieved Report
D11.1 Sustainable Accelerators report 11 11.1 M45 02/04/2025 Achieved Report